Container 85 - Wexford Sewage Scheme Water Conservation Project

Limistéar aitheantais

Cód tagartha

UGA P164/4/85

Teideal

Wexford Sewage Scheme Water Conservation Project

Dáta(í)

  • 02/01/2004-11/01/2004

Leibhéal tuairisce

Container

Méid agus meán

28 files, 215 MB

Limistéar comhthéacs

Stair chartlainne

Foinse dhíreach an tsealbhúcháin nó aistriú

Limistéar ábhair agus struchtúir

Scóip agus ábhar

CD-RW (copied October 2004) containing materials pertaining to the Wexford Sewage Scheme Water Conservation Project. Casey was commissioned to survey the areas to be disturbed by the replacements of a 4.2 km length of water pipe between Raheen Beg and Ballycanew village, and a 1.8 km length of water pipe between Ballygarrett village and Ballynagam. The report reveals itemises 9 features and monuments within the study area, of which one, a stone humpback bridge at Coolook Beg, may be slightly impacted. The CD-RW contains photographs, annotated maps, and two reports (2 January 2004 and 6 January 2004) authored by Casey (see P164/1/1/31 for a physical copy of the 6 January report).

Appraisal, destruction and scheduling

Breisiúcháin

System of arrangement

Coinníollacha rochtana agus úsáide

Coinníollacha a rialaíonn rochtain

Open

Coinníollacha a rialaíonn atáirgeadh

Teanga an ábhair

    Script of material

      Nótaí teanga agus scripte

      Physical characteristics and technical requirements

      Áiseanna aimsithe

      Limistéar ina bhfuil ábhar gaolmhar

      Existence and location of originals

      Existence and location of copies

      Related units of description

      Related descriptions

      Notes area

      Note

      Catalog

      Aitheantóir(í) malartach(a)

      Pointí rochtana

      Subject access points

      Place access points

      Taifid údaráis

      Pointí rochtana seánra

      Description control area

      Description identifier

      Aitheantóir institiúide

      Rules and/or conventions used

      Status

      Catalogued

      Leibhéal mionsonraí

      Dátaí cruthaithe athbhreithnithe nó scrios

      06/08/2024
      26/06/2025

      Teanga(cha)

        Script(s)

          Sources

          Limistéar forshealbhúcháin