File 1 - Save Wood Quay Campaign 1968-1976

Limistéar aitheantais

Cód tagartha

UGA P143/1/2/9/1

Teideal

Save Wood Quay Campaign 1968-1976

Dáta(í)

  • 19/11/1968-30/07/1976

Leibhéal tuairisce

File

Méid agus meán

176pp

Limistéar comhthéacs

Stair chartlainne

Foinse dhíreach an tsealbhúcháin nó aistriú

Limistéar ábhair agus struchtúir

Scóip agus ábhar

Material in this folder consists mainly of research material, photocopies of press articles, minutes of meetings between Dublin Corporation, the National Museum and the consultant architects for the proposed project, and correspondence. It includes correspondence between Dublin Civic Group and Dublin Corporation 15/01/1968; correspondence between Dept of Local Government and Dublin City and County Manager, City Hall 31/07/1972; copy of judgement delivered in similar case Tormey v Commissioners for Public Works, 21/12/1972; correspondence between Richard Haworth, Archaeologist, The National Institute for Physical Planning and Construction Research, and H Byrne, Principal Officer, Development Section, Dublin Corporation 28/02/1974- 07/05/1974; report of public meeting, Mansion House, Dublin, 12/03/1974 relating to Archaeological Investigation in Dublin and Wood Quay; minutes of meetings of Dublin City Council, Dublin Corporation and between representatives of Dublin Corporation, the National Museum and the Consultant Architects, Stephenson, Gibney and Associates 13/03/1974-01/07/1975; correspondence between The National Museum and the Consultant Architects 09/04/1974; correspondence between H Byrne, Principal Officer, and others, Development Section, Dublin Corporation and the Consultant Architects 07/05/1974-13/03/1975; copy of letter from Senator MR to Professor Otway-Ruthven following his verbal expression of worry, and including letter from several professors to the Irish times, 26/09/1974; correspondence between The National Museum and Dublin Corporation 10/3/1975-30/07/1976; photocopy of telegram from Irish Association of Professional Archaeologists' AGM requesting mechanical work on site be suspended, 23/04/1975, and correspondence from them 30/04/1975; letter between secretary, Department of Education and Dublin City Council 10/07/1975; report to Assistant City Manager from Assistant Development Officer, Development Department, Dublin Corporation, 20/01/1976

Archivist's Note: some of this material was possibly photocopied at a later stage as part of briefs for counsel in the late 1970s but has since been separated. It is presented here based on date of creation of the original record, not when the copy was made

Appraisal, destruction and scheduling

Breisiúcháin

System of arrangement

Coinníollacha rochtana agus úsáide

Coinníollacha a rialaíonn rochtain

Open

Coinníollacha a rialaíonn atáirgeadh

Teanga an ábhair

    Script of material

      Nótaí teanga agus scripte

      Physical characteristics and technical requirements

      Áiseanna aimsithe

      Limistéar ina bhfuil ábhar gaolmhar

      Existence and location of originals

      Red storeroom

      Existence and location of copies

      Related units of description

      Related descriptions

      Notes area

      Note

      Catalog

      Aitheantóir(í) malartach(a)

      Pointí rochtana

      Subject access points

      Place access points

      Taifid údaráis

      Pointí rochtana seánra

      Description control area

      Description identifier

      Aitheantóir institiúide

      Rules and/or conventions used

      Status

      Catalogued

      Leibhéal mionsonraí

      Dátaí cruthaithe athbhreithnithe nó scrios

      01/10/2024
      26/06/2025

      Teanga(cha)

        Script(s)

          Sources

          Limistéar forshealbhúcháin