Item 15 - Draft – Archaeology, Architecture & Cultural Heritage, N7 Nenagh to Limerick High Quality Dual Carriageway/Motorway Environmental Impact Statement

Identity area

Reference code

UGA P/P164/1/2/15

Title

Draft – Archaeology, Architecture & Cultural Heritage, N7 Nenagh to Limerick High Quality Dual Carriageway/Motorway Environmental Impact Statement

Date(s)

  • 01/08/2002

Level of description

Item

Extent and medium

92pp

Context area

Archival history

Immediate source of acquisition or transfer

Content and structure area

Scope and content

Draft of a report authored by Marion Sutton and Jackie Jordan of Margaret Gowen & Co. Ltd. for M.C. O'Sullivan Scetauroute Joint Venture on behalf of relevant local authorities. The report comprises a chapter in the environmental impact statement regarding the construction of the M7 motorway between Nenagh and Limerick, and outlines mitigation measures for archaeological sites to be impacted by motorway construction.

Appraisal, destruction and scheduling

Breisiúcháin

System of arrangement

Conditions of access and use area

Conditions governing access

Open

Coinníollacha a rialaíonn atáirgeadh

Teanga an ábhair

    Script of material

      Nótaí teanga agus scripte

      Physical characteristics and technical requirements

      Áiseanna aimsithe

      Allied materials area

      Existence and location of originals

      Existence and location of copies

      Related units of description

      Related descriptions

      Note

      Catalog

      Alternative identifier(s)

      Access points

      Subject access points

      Place access points

      Name access points

      Genre access points

      Description identifier

      Institution identifier

      Rules and/or conventions used

      Status

      Catalogued

      Level of detail

      Dátaí cruthaithe athbhreithnithe nó scrios

      07/08/2024
      29/07/2025

      Language(s)

        Script(s)

          Sources

          Limistéar forshealbhúcháin